REVIEW ARTICLE


Study on Automatic Spray of Distribution Boom System of Truck-Mounted Concrete Pump



Shu-Wen Zhou, Li-Xin Guo*, Si-Qi Zhang
College of Mechanical Engineering and Automation, Northeastern University, Shenyang 110004, China


© 2008 Zhou et al.

open-access license: This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International Public License (CC-BY 4.0), a copy of which is available at: (https://creativecommons.org/licenses/by/4.0/legalcode). This license permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

* Address correspondence to this author at the College of Mechanical Engineering and Automation, Northeastern University, Shenyang 110004, China; E-mail: lxguo@mail.neu.edu.cn


Abstract

Truck-mounted concrete pumps have been adopted in many construction projects. However, the investigations about the automatization or robotization of distribution boom system of the truck-mounted concrete pump are very scattered. In this study, a scheme of automatic concrete spray of the distribution boom system of the truck-mounted concrete pump has been presented and discussed. The concrete spray process and the kinematics of the boom sections were analyzed including its inverse kinematics problem. Transient dynamic analysis was performed to validate the effect of the new control system on the boom system base on the flexible body co-simulation among ANSYS software, ADAMS software and Matlab/Simulink software. A three-dimensional simulation was programmed to imitate the process of automatic spray and verify the control algorithm. The simulation result shows that the system can pour concrete on a long narrow area automatically thereby satisfying, and the trajectory movement of boom mechanism.

Keywords: Concrete pump, boom system, automatic spray, co-simulation.