REVIEW ARTICLE
The Determination of Condition Met by Boom System Working in Safety Based on Multiple Load Case Analysis
Wenhui Yue*, Jianxin Weng, Liangpei Huang, Yongxing Zhu, Penghui Duan
Article Information
Identifiers and Pagination:
Year: 2014Volume: 8
First Page: 107
Last Page: 112
Publisher Id: TOMEJ-8-107
DOI: 10.2174/1874155X20140501001
Article History:
Received Date: 17/01/2014Revision Received Date: 25/03/2014
Acceptance Date: 26/03/2014
Electronic publication date: 18/4/2014
Collection year: 2014
open-access license: This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International Public License (CC-BY 4.0), a copy of which is available at: (https://creativecommons.org/licenses/by/4.0/legalcode). This license permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Abstract
Loads subjected by the boom system on the concrete pump are so complex, that fatigue cracks or fatigue fractures appear, which may lead to loss of property and casualty. However, when the concrete pump is functioning in safe condition, the damage of the boom system is reduced, thereby preventing the accidents. In order to select safe working conditions, a boom system of 37m concrete pump as research object should be adopted. The finite element analysis is carried out on the boom system based on MSC. Patran and Nastran, with regularly varying degrees, and changing trends of the maximum stresses subjected by booms with the change of degrees of booms, attained a safe condition of the boom system. Finally, taking the four kinds of typical foundation casting working conditions as example, the feasibility of using this condition to determine the safe working condition has been verified.